Projects

Switchgear Retrofit

Before

Switchgear retrofit before

After

Switchgear retrofit after

Before

Switchgear retrofit before

After

Switchgear retrofit after

Used existing cell structure and incoming cables at site and re-worked the bus connections to a newer
style interior replacement with updated feeder circuits with future options to upgrade and expand
circuits within the facility.

Transformer Bushing Replacement

Transformer bushing replacement

Replaced damaged and leaking low voltage bushings on a transformer.

Transformer Untanking Inspection

Transformer untanking inspection

Full internal detailed inspection of a liquid filled transformer to determine problems, possible cause of failures and repairs.

Transformer Bushing Re-Gasket

Before

Transformer bushing re-gasket before

After

Transformer bushing re-gasket after

Replaced gasketing material on liquid filled transformer bushings to prevent dielectric fluid leakage, this will prevent premature failure of the unit in operation and maintain environment standards.

ATS Integration

ATS integration

Installing an automatic transfer switch in to a new standard free issued distribution board to allow the hook up of a generator as back up power in the event of hydro loss.

ATS Integration - Custom Bus Work

ATS integration custom bus work
ATS integration custom bus work

Custom bus work to allow the number of cables per phase and entry point from the generator side and allowing for the potential of more than one or two sources of power.